Brewster High School Modernization

Carried out in phases to allow the school to remain in use during construction, the project transformed learning, athletic, and support spaces across the two-story facility.

Brewster High School Commons
Brewster High School Wood Shop

Interior improvements reconfigured classrooms, offices, the library, and music areas, while also upgrading major systems, finishes, and life-safety infrastructure throughout the building.

The work created a more cohesive daily experience for students and staff, including a new wood gym floor, second-level walking track, and a full-service kitchen that now serves the entire district.

Brewster High School Kitchen
Brewster High School Track & Field

Site and athletic improvements extended that impact beyond the building through a renewed football and track complex, improved accessibility, updated circulation, and infrastructure upgrades.

Owner

Brewster School District

Location

Brewster, Washington

Size

77,656 sf Modernization

Delivery Method

Design/Bid/Build

Services

Study & Survey, Pre-bond Assistance, Long Range Planning, Public Engagement, Architecture, Landscape Architecture

Team Partners +

Team Partners -

Contractor: Leone & Keeble
Structural: Eclipse Engineering
Mechanical:  MSI Engineers
Electrical: Coffman Engineers
Civil: Coffman Engineers
Fire Protection: FP Engineering

Project Facts

  • Funding included an OSPI Emergency Grant, OSPI SCAP funding, and a local bond